Through constructions on arched bridges
Research output: Contribution to book/conference proceedings/anthology/report › Conference contribution › Contributed › peer-review
Contributors
Abstract
Due to the fact that the vault bridges in DB Netz AG's inventory are getting older and older, a consistent approach to these historic structures must be taken. Based on the systematically recorded and classified damages, a deck slab or a sealing with beam construction between the upper edge of the vault and the upper edge of the rails should be implemented. A complex fundamental renewal should be carried out on the structure, e.g. drying of the structure, sealing with a new drainage system and the creation of the required safety space. In order to effectively implement this concept, a comprehensive module is to be introduced in the regulations of the Deutsche Bahn.
Details
Original language | English |
---|---|
Title of host publication | IABSE Symposium Prague, 2022 |
Publisher | International Association for Bridge and Structural Engineering (IABSE), Zürich |
Pages | 1100-1107 |
Number of pages | 8 |
ISBN (electronic) | 9783857481833 |
Publication status | Published - 2022 |
Peer-reviewed | Yes |
Publication series
Series | IABSE Symposium Report |
---|
Conference
Title | IABSE Symposium Prague 2022 |
---|---|
Subtitle | Challenges for Existing and Oncoming Structures |
Abbreviated title | IABSE 2022 |
Duration | 25 - 27 May 2022 |
City | Prague |
Country | Czech Republic |
External IDs
ORCID | /0000-0001-8735-1345/work/142244511 |
---|
Keywords
ASJC Scopus subject areas
Keywords
- condition category, financing eligibility, fundamental renewal, historic arch bridge, through module