Spannbetonbau in der DDR: Anwendung und experimentelle Untersuchung des ITB-Spannverfahrens
Research output: Contribution to journal › Research article › Contributed › peer-review
Contributors
Abstract
The paper gives an overview of the pre-stressing systems used in the former GDR and describes one system, called ITB, in detail. During the demolition of the bridge "10. Jahrestag" in Neubrandenburg, at which this pre-stressing system was first used, material samples and a specimen were taken and experimentally investigated. For the objective of the investigation of a pre-stressed concrete element without non-pre-stressed reinforcement, a cut out beam of a bridge was loaded until failure and different measuring technologies, like the photogrammetry, the acoustic emission analyses and the sectionwise curvature-measurement were used. The results of this experimental investigation are discussed in detail and the bearing behavior according to an unannounced failure is evaluated.
| Translated title of the contribution | Investigations on a pre-stressed concrete bridge beam without pre-tensioned reinforcement |
|---|
Details
| Original language | German |
|---|---|
| Pages (from-to) | 384-393 |
| Number of pages | 10 |
| Journal | Beton- und Stahlbetonbau |
| Volume | 109 |
| Issue number | 6 |
| Publication status | Published - Jun 2014 |
| Peer-reviewed | Yes |
External IDs
| ORCID | /0000-0001-8735-1345/work/142244615 |
|---|