Mixed Energy and Production Scheduling in an Eco-Industrial Park

Research output: Contribution to book/Conference proceedings/Anthology/ReportConference contributionContributedpeer-review

Contributors

  • Shufang Xie - , Bundeswehr University of Munich (Author)
  • Tao Zhang - , Bundeswehr University of Munich (Author)
  • Oliver Rose - , Bundeswehr University of Munich (Author)
  • Tobias Uhlig - , Bundeswehr University of Munich (Author)
  • Björn Vollack - , Chair of Material Handling (Author)

Abstract

In recent times, eco-industrial parks (EIP) have taken on a significant role in addressing environmental challenges and supporting sustainable practices. To enhance the efficient utilization of energy within the park and ensure the achievement of production targets among its members, the implementation of energy and production scheduling is imperative. This paper addresses this optimization challenge by formulating it into a constraint programming (CP) model. The optimized scheduling solutions generated by the CP model will be directly used to guide the operations within the simulation environment of the EIP. The paper compares the CP results with the results of another method which we developed in our previous research stage. The outcomes of CP solver demonstrate its effectiveness in optimizing energy utilization and meeting production targets. This research contributes to developing a practical decision support system for resolving real-life scheduling problems in industry parks.

Details

Original languageEnglish
Title of host publication2024 Winter Simulation Conference (WSC)
PublisherIEEE
Pages810-821
Number of pages12
ISBN (electronic)979-8-3315-3420-2
ISBN (print)979-8-3315-3421-9
Publication statusPublished - 2024
Peer-reviewedYes

External IDs

Scopus 85217620701