Instandsetzung und Neubau mit UHFB-Fertigteilen im Netz der Deutschen Bahn
Research output: Contribution to specialist publication › Feature article/Contribution (Feuilleton) › Contributed › peer-review
Contributors
Abstract
Maintaining our infrastructure is one of the most important tasks and challenges of our time. When it comes to deciding between new construction or maintenance within the rail infrastructure of the Deutsche Bahn network, the focus is on rapid construction causing the least possible disruption to railway operations, the design of durable, low-maintenance structures, and cost effectiveness.
| Translated title of the contribution | Repair and new construction using precast UHPFRC elements in the Deutsche Bahn railway network |
|---|
Details
| Original language | German |
|---|---|
| Pages | 79-80 |
| Number of pages | 2 |
| Volume | 91 |
| Issue number | 3 |
| Journal | Betonwerk und Fertigteil-Technik/Concrete Plant and Precast Technology |
| Publication status | Published - 2025 |
| Peer-reviewed | Yes |
No renderer: customAssociatesEventsRenderPortal,dk.atira.pure.api.shared.model.researchoutput.ContributionToPeriodical
External IDs
| ORCID | /0000-0001-8735-1345/work/192582455 |
|---|