Entwurf und Ausführungsplanung der Stöbnitztalbrücke

Publikation: Beitrag in FachzeitschriftForschungsartikelBeigetragenBegutachtung

Beitragende

  • Rolf Jung - , Leonhardt, Andrä und Partner Beratende Ingenieure VBI AG Dresden (Autor:in)
  • Steffen Marx - , DB Netz AG - Stiftungsprofessur für Ingenieurbau, University of California at San Diego (Autor:in)
  • Marcus Schenkel - , Deutsche Bahn (Autor:in)
  • Rico Stockmann - , Leonhardt, Andrä und Partner Beratende Ingenieure VBI AG Dresden (Autor:in)

Abstract

The Bridge over Stoebnitz Valley - a Bridge without Bearings on High-Speed Railway Route Erfurt - Leipzig/Halle Currently some large valley bridges are under construction on high-speed railway route Erfurt-Leipzig/Halle. These bridges follow a new holistic design philosophy. The superstructures of those integral or semi-integral bridges are rigidly connected to the abutments and the columns. Therefore, they are more slender than conventional bridges and the bridges are very robust and durable because of the omitting of bearings and dilatation joints. The bridges over Scherkonde valley and over Gaensebach valley were already described in previous issues. In this paper the construction of the bridge crossing Stoebnitz valley is reported. This bridge is being built as an alternate design of the contractor.

Details

OriginalspracheDeutsch
Seiten (von - bis)81-88
Seitenumfang8
FachzeitschriftBeton- und Stahlbetonbau
Jahrgang106
Ausgabenummer2
PublikationsstatusVeröffentlicht - Feb. 2011
Peer-Review-StatusJa

Externe IDs

ORCID /0000-0001-8735-1345/work/142244631

Schlagworte

ASJC Scopus Sachgebiete

Schlagwörter

  • Allgemeines, Bauausführung, Brückenbau, Entwurf