Towards an optimal integrated reservoir system management for the awash river basin, Ethiopia

Publikation: Beitrag in FachzeitschriftKonferenzartikelBeigetragenBegutachtung

Beitragende

Abstract

Recently, the Kessem–Tendaho project is completed to bring about socioeconomic development and growth in the Awash River Basin, Ethiopia. To support reservoir Koka, two new reservoirs where built together with extensive infrastructure for new irrigation projects. For best possible socioeconomic benefits under conflicting management goals, like energy production at three hydropower stations and basin wide water supply at various sites, an integrated reservoir system management is required. To satisfy the multi-purpose nature of the reservoir system, multi-objective parameterization-simulation-optimization model is applied. Different Pareto-optimal trade-off solutions between water supply and hydro-power generation are provided for two scenarios (i) recent conditions and (ii) future planned increases for Tendaho and Upper Awash Irrigation projects. Reservoir performance is further assessed under (i) rule curves with a high degree of freedom – this allows for best performance, but May result in rules curves to variable for real word operation and (ii) smooth rule curves, obtained by artificial neuronal networks. The results show no performance penalty for smooth rule curves under future conditions but a notable penalty under recent conditions.

Details

OriginalspracheEnglisch
Seiten (von - bis)215-219
Seitenumfang5
FachzeitschriftIAHS-AISH Proceedings and Reports
Jahrgang373
PublikationsstatusVeröffentlicht - 12 Mai 2016
Peer-Review-StatusJa

Konferenz

Titel7th International Water Resources Management Conference of IAHS-ICWRS 2016
Dauer18 - 20 Mai 2016
StadtBochum
LandDeutschland

Schlagworte

ASJC Scopus Sachgebiete