Multi-site aggregate production planning with resilience consideration

Publikation: Beitrag in FachzeitschriftKonferenzartikelBeigetragenBegutachtung

Beitragende

Abstract

The recent years have shown a high frequency of disruptions like natural disasters or manmade disruptions, leading, for example, to transport routes or production facilities being unavailable for extended periods. Many manufacturing companies, which nowadays operate in a global production network, are heavily exposed to these disruptions. This results in both significant costs and substantial exceeding of promised deadlines. If it concerns the first company in a supply chain, it causes correspondingly significant delays in promised deadlines for subsequent companies in the supply chain, including a correspondingly significant increase in costs. Both are exemplified in this paper through a case study. This case study demonstrates that through resilience, both implications can be significantly reduced.

Details

OriginalspracheEnglisch
Seiten (von - bis)345-351
Seitenumfang7
FachzeitschriftProceedings - European Council for Modelling and Simulation, ECMS
Jahrgang38
Ausgabenummer1
PublikationsstatusVeröffentlicht - 2024
Peer-Review-StatusJa

Konferenz

Titel38th ECMS International Conference on Modelling and Simulation
KurztitelECMS 2024
Veranstaltungsnummer38
Dauer4 - 7 Juni 2024
Webseite
BekanntheitsgradInternationale Veranstaltung
OrtCracow University of Technology
StadtKrakau
LandPolen

Schlagworte

ASJC Scopus Sachgebiete

Schlagwörter

  • Aggregate Production Planning, Linear Programming, Multi-Site Production Planning and Control, Production Planning and Control, Supply Chain Resilience