Behavior of transition plates crossing high-speed railway bridge joints in Germany

Publikation: Beitrag in FachzeitschriftKonferenzartikelBeigetragenBegutachtung

Beitragende

  • Sisi Zhang - , Leibniz Universität Hannover (LUH) (Autor:in)
  • Steffen Marx - , Leibniz Universität Hannover (LUH) (Autor:in)
  • Marc Wenner - , Marx Krontal Partner GmbH (Autor:in)

Abstract

Great stresses at the continuously welded rails (CWR) and large fastener forces at bridge joints due to the deformation of bridge ends have been observed in German high-speed railway lines. In order to limit the influence of this localized track-bridge interaction, a novel structure with a transition plate crossing the bridge joints has been applied in the new German high-speed railway line. The utilization of transition plates reduces the restraint forces caused by the deformation of the bridge ends. It divides the large gap at the bridge ends to two smaller gaps at the transition plate ends and ensures that the tensile and compressive forces in the fasteners do not exceed the permitted values at the bridge ends. In this paper, the behavior of the transition plates crossing the bridge joints is discussed. Measured bearing settlements and the dynamic response of the transition plates crossing bridge joints under high-speed train loads are analyzed.

Details

OriginalspracheEnglisch
Seiten (von - bis)2856-2863
Seitenumfang8
FachzeitschriftIABSE symposium - report
PublikationsstatusVeröffentlicht - 2017
Peer-Review-StatusJa
Extern publiziertJa

(Fach-)Tagung

Titel39th IABSE Symposium 2017
UntertitelEngineering the Future
KurztitelIABSE 2017
Veranstaltungsnummer39
Dauer19 - 23 September 2017
Webseite
BekanntheitsgradInternationale Veranstaltung
OrtThe Westin Bayshore Hotel & Conference Center
StadtVancouver
LandKanada

Externe IDs

ORCID /0000-0001-8735-1345/work/142244571

Schlagworte

ASJC Scopus Sachgebiete

Schlagwörter

  • Bridge joints, Bridge monitoring, High-speed railway, Track-bridge interaction, Transition plates